[#91] An optimum project schedule implies
Correct Answer

(B) Lowest possible cost and shortest possible time for project

Explanation

Solution: An optimum project schedule implies Lowest possible cost and shortest possible time for project

[#92] Choose the wrong statement Time study is used to
Correct Answer

(A) Determine overhead expenses

Explanation

Solution: Time study is a structured process of directly observing and measuring human work using a timing device to establish the time required for completion of the work by a qualified worker when working at a defined level of performance.

[#93] Time study is used to
Correct Answer

(D) All of the above

Explanation

Solution: Time study is a structured process of directly observing and measuring human work using a timing device to establish the time required for completion of the work by a qualified worker when working at a defined level of performance.

[#94] P.M.T.S. (Predetermined Motion Time Systems) include
Correct Answer

(D) All of these

Explanation

Solution: A predetermined motion time system (PMTS) is frequently used to perform Labor Minute Costing in order to set piece-rates, wage-rates and/or incentives in labor (labour) oriented industries by quantifying the amount of time required to perform specific tasks under defined conditions.

[#95] PMTP (predetermined motion time systems) include
Correct Answer

(D) All of the above

Explanation

Solution: PMTP (predetermined motion time systems) include - MTM (method time measurement) -WFS (work factor systems) - BNTS (basic motion time study)