[#236] The latest time that the event can be delayed without delaying the completion of the entire project in PERT chart is
Correct Answer
(B) latest allowable time
[#237] Which statement is true?
Correct Answer
(D) None of the above
(H) None of the above
[#238] Types of follow-up includes
Correct Answer
(D) all of the above
[#239] Which of the following is not a characteristic of the LP?
Correct Answer
(D) The problem must be of minimization type
Explanation
Solution: The problem must be of minimization type is not a characteristic of the LP. The objective of linear programming is to: “maximize or to minimize some numerical value.
[#240] Non-negativity condition in an LP model implies.
Correct Answer
(D) None of the above
Explanation
Solution: Non-negativity restriction indicates that all decision variables must take on values equal to or greater than zero.