Indian Railway - Study Mode
[#271] The consumption of fuel during idle run per hour is
Correct Answer
(C) 25 Lts
[#272] Illuminated A marker of semi-automatic signal means ________.
Correct Answer
(A) Working as automatic signal
[#273] At a C' class staion in two aspect signalling system, ________ and home signals are provided.
Correct Answer
(B) Warner
[#274] When the rail failure is rectified by the train can pass at speed
Correct Answer
(C) 30 kmph
[#275] Shunting to be done in D/L block section
Correct Answer
(C) T-806