Indian Railway - Study Mode
[#171] On double line, when a running line is blocked by stabled load , the point to be set against are
Correct Answer
(B) Rear points
[#172] After TFC, all the related authorities are inspected by ________ and its report is sent to DRM within 7 days.
Correct Answer
(A) TI
[#173] After train parting when the portion is dispatched ________ is the authority for the driver to go to next station.
Correct Answer
(D) T/609
[#174] The speed of engine movement from traffic yard to loco and loco to traffic yard is
Correct Answer
(B) 10 kmph
[#175] What will be the code of engine whistle during signal passing at ON or in defective condition on proper authority information by the Loco Pilot to Guard ?
Correct Answer
(A) 0-0