Indian Railway - Study Mode

[#96] High flood level mark shall be painted in
Correct Answer

(A) Red

[#97] In case of block forward, private number of ________ station is written on shunting authority.
Correct Answer

(A) T/806

[#98] Signal sighting committee consists of TI, SI/PWI and ________.
Correct Answer

(B) T/D 912

[#99] In case of 1 in 100 rising gradient, ________ siding is provided.
Correct Answer

(C) Slip

[#100] When signal is not visible from minimum sighting distance, ________ signal is provided.
Correct Answer

(A) Repeating