Indian Railway - Study Mode

[#661] Engineering allowance, loco gain and traffic gain are mentioned in the ________.
Correct Answer

(B) WTT

[#662] Signal has extinguished.
Correct Answer

(C) ------00

[#663] After getting T/369(I) speed over the points while passing the signal is ________ km/h.
Correct Answer

(B) 15

[#664] Maximum speed of trains during thick & foggy weather in absolute block system is ________ when signal is showing green.
Correct Answer

(C) 30

[#665] If the Loco Pilot sounds long short long short whistle and passes the home signal it means ________.
Correct Answer

(B) Train parted