Indian Railway - Study Mode
[#621] When a goods train is working without brake can the speed is
Correct Answer
(D) None of these
[#622] Modified lower quadrant signaling may be introduced only with section of
Correct Answer
(B) CRS
[#623] Speed of Train over points shall be ________ Km/h when the points are clamped and padlocked after disconnection of points.
Correct Answer
(D) 15
[#624] In automatic section, temporary single line working on double line section what authority to proceed will be served to loco pilot from opposite direction?
Correct Answer
(A) TA-912
[#625] When a motor trolley is in charge of office, the motor trolley can go upto outer most facing points after waiting for ________ minutes.
Correct Answer
(A) 10