Indian Railway - Study Mode

[#576] To attach the 12 coach EMU rake, ________ units are to be attached.
Correct Answer

(D) 04

[#577] The additional Hours in the case of staff posted at way side stations who are provided with quarters within 0.5kkm will be ________ beyond.
Correct Answer

(C) 24 Hours

[#578] To admit the train on loop line, generally the far end points are to be ser for ________.
Correct Answer

(B) Main line

[#579] Overloading Tolerance for a 8 wheeler bogie MG vehicle is
Correct Answer

(B) 1 Tonne

[#580] Rake link book-let is prepared by COM and ________.
Correct Answer

(A) CPTM