[#46] The trap which is provided to disconnect the house drain from the street sewer is called
Correct Answer

(D) All the above

[#47] Pick up the excavation where measurements are made in square meters for payment.
Correct Answer

(D) Both (B) and (C)

[#48] A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2 : 1, the earth work involved.
Correct Answer

(D) 27,500 m 3

[#49] The floor area includes the area of the balcony up to
Correct Answer

(C) 50 %

[#50] For the construction of buildings, the subheads of the estimate are
Correct Answer

(D) All the above