Drilling And Blasting - Study Mode

[#266] No drill shall be used for boring a shot hole unless it allows a clearance of at least "A" em over the diameter of the explosive cartridge. A is given
Correct Answer

(D) 0.3

[#267] The minimum pillar to pillar distance of the depth of the seam is 150 m and gallery width is 3.6 m.
Correct Answer

(B) 19.5 m

[#268] Meen air temperature of a 450 m deep down cast shaft is 29°C and that of the up cast shaft is 37°C, the height of the motion column m is . . . . . . . .
Correct Answer

(C) 11.6

[#269] For reducing leakage in u/g workings it has been recommended to use.
Correct Answer

(B) Low pressure fan in series

[#270] The constituents in slurry explosive are
Correct Answer

(A) Fuel sensitizer, oxidizer, water, thicker, cross linking agents, gassy agent, stabilizer