Coal Mining - Study Mode
[#451] Half moon method of extraction of stooks will be employed when roof is
Correct Answer
(D) Unreliable
[#452] The thickness of isolation stopping in deg I gassy mine.
Correct Answer
(B) 1 m
[#453] The upper portion of the sand stowing pipe is generally changed after the transport of . . . . . . . . lac ton of sand.
Correct Answer
(B) 2 - 4
[#454] Mud bucket also called
Correct Answer
(A) Calyx
[#455] A level roadway along the roof of the seam in level mining called . . . . . . . .
Correct Answer
(A) Floor lateral