[#211] Crown is located at
Correct Answer

(A) Highest point on the extrados of the arch

[#212] The ceiling height of a building is
Correct Answer

(B) Between ceiling and floor level

[#213] To ensure that supporting area of an offset footing of a boundary wall is fully compressive, the C.G. of load must act
Correct Answer

(B) Within the middle third of the base

[#214] The vertical faces of a door opening which support frame of the door, are
Correct Answer

(A) Jambs

[#215] In verandah (corridor) floors outward slope is
Correct Answer

(C) 1 in 60